EN TH
Power Generation Business
  • Wind Farm
  • Coal-fired power plant

Ben Tre

Thanh Phong Wind Power Project
Type : SPP
Turbine Type : Wind Turbine
Equity holding : 51%
Fuel Type : Wind Power
Total Installed Capacity (MW) : 29.70 MW
PPA (Years) Expire in 2041

Quang Ninh province

Thang Long Thermal Power Plant
Type : IPP
Turbine Type : Thermal
Equity holding : 22.05% (ABEIF Fund holds 45% in the project)
Fuel Type : Coal
Total Installed Capacity (MW) : 620 MW
PPA (Years) 25 years
All Project