     Project
Yandin Wind Farm Location: Australia
Type: IPP
Operator: RATCH-Australia Corporation Pty Ltd
Collector Wind Farm Location: Australia
Type: IPP
Operator: RATCH-Australia Corporation Pty Ltd
Status
Under grid compliance test process
Share- holding (%)
100
Equity installed capacity (MW)
149.94
226.8
Projected GHG emission reduction/year (tCO2e)
     70
446,775
    427,680
          Equity operating capacity in 2020
GHG emissions reduced by renewable energy projects in 2020
Hydroelectric 418.51 MW
6.3%
Wind 287.85 MW 4.4%
Solar 72.48 MW
1.1%
Biomass 3.96 MW
0.1%
Solar
92,612
tCO2e
Biomass
15,122
tCO2e
Wind
           Fossil fuels 5,817.10 MW
88.1%
Emissions reduction VS. Emission targets
Hydroelectric
563,325
tCO2e
548,011
tCO2e
 RATCH sets GHG emissions reduction target for the Company’s gas-fired IPP at 0.4945 tons of carbon dioxide equivalent per megawatt-hour, the base case agreed upon in 2019 by Thailand Greenhouse Gas Management Organization (Public Organization), the Office of Natural Resources and Environmental Policy and Planning, the Energy Policy and Planning Office and Electricity Generating Authority of Thailand. The electricity generation business is operated accordingly to the power purchase agreements with the primary customer, EGAT, and each power plant’s output and type of fuels are determined by the customer, which commands the power plants through the National Control Center. In 2020, the GHG emissions per megawatt-hour by RATCH Group’s IPPs were higher than the target.