 Guidelines on the management of key contractual specifications
Availability Payment
Reliability
Heat Rate
  • Target availability is set on an annual basis, aligned with the Contracted Availability Hour (CAH).
• Inability to maintain contractual availability payment will result in penalties.
• Crucial to secure customer satisfaction.
• Reliabilityreferstothenumberof operating hours against unplanned outage hours.
• Inpurchaseagreements,unplanned outage hour is set at 3-5 percent of contracted availability hour.
• Unplannedoutagehourisakeyfactor to determine availability payment.
   • Heat rate is specified in PPAs, covering the amount of energy used to generate one kilowatt-hour (kWh) of electricity.
• Heat rate reflects customers’ cost of electricity.
• Power plants’ maximum generating efficiency must be maintained, to minimize fuels as much as possible.
• Heat rate is aligned with each power plant’s efficiency. Low heat rate indicates high efficiency.
 Availability and Reliability of RATCH-controlled power plants
 Power plant
Equivalent Availability Factor (EAF)
Reliability Factor (RF)
    Target
Performance
Target
Performance
     Ratchaburi Thermal Power Plant Unit 1
95.47
97.18
  Ratchaburi Thermal Power Plant Unit 2
Ratchaburi Combined Cycle Power Plant Block 1
95.47
89.16
97.18
95.30
95.47
95.47
92.97
97.18
   97.18
     97.94
     Ratchaburi Combined Cycle Power Plant Block 2
89.16
95.77
92.97
98.18
     Ratchaburi Combined Cycle Power Plant Block 3
79.74
83.67
92.95
97.53
     Nava Nakorn Cogeneration
97.77
98.49
   Berkprai Cogeneration Power Plant
RATCH Cogeneration
97.03
98.75
   91.99
96.60
    Unspecified
 Heat Rate: (Unit: BTU/kWh)
 Power plant
Natural gas
Diesel oil
 Target
 Performance
 Target
 Performance
Ratchaburi Thermal Power Plant Unit 1
 Under “reserved shutdown” ordered by National Control Center
Not used
  Ratchaburi Thermal Power Plant Unit 2
 Ratchaburi Combined Cycle Power Plant Block 1
  7,184
  7,139
 Unspecified
Ratchaburi Combined Cycle Power Plant Block 2
 7,166
 7,143
 Ratchaburi Combined Cycle Power Plant Block 3
7,204
7,149
 Nava Nakorn Cogeneration
  7,873
  7,978
  Not used
 Berkprai Cogeneration Power Plant
 7,383
 7,380
 RATCH Cogeneration
 7,800
 7,907
   Noted : Tri Energy Power Plant was not ordered for generation in January-June (PPA expired on 30 June 2020)